TYPICAL PROJECTS
·
2.5MM
Project manager of a new 21MMBTU B&W Boiler installation and DA upgrade
·
Project
Engineer of a Recovery Boiler mud drum and internals upgrade, 21 day power outage, over 100 contractors,
temporary package boiler hookup design and install
·
$30MM
PM wet end rebuild-mechanical support engineer and PM liaison.
·
Outfall
pipe repairs –Rehabilitation of Effluent Pipe and new controls Monitoring
·
$3mm
New HD Bleached pulp Tower installation- Project Engineer - Managed
construction and designed inlet and outlet piping, pumps and system controls.
·
$21MM
Petro-Chemical Plant Upgrade- Sr Mech. Project
Engineer- New: Dust Collectors, Bin Vents, HVAC Chillers, Reactors, Kilns,
Cyclones, dense phase pneumatic convey systems, major equipment relocation,
Railcar Unloading facility, Steel Tower structure, Blower systems- zero safety
incidents- over 200 contractors and 3 engineering firms.
·
Numerous
Pump and Piping systems 2”-60” - Stock prep, ANSI, Vertical turbine well pumps,
submersible, chemical hazardous duty,
·
Project
Engineer of various material handling equipment -
Design of lift elevators, screw conveyors, and belt conveyors.
·
Project
Engineer for Environmental Scrubber scope, estimate and install.
·
Project
Engineering- Calciner (Kiln) Installations
·
Project
design of numerous HVAC installations 1
ton – 75 ton
·
Project
design and engineering of numerous Gearboxes, Mixers, pulley systems, and gear
systems
·
Project
Manger of various Structural Upgrades – Complete razing of buildings to
installing new steel galvanized towers, numerous structural platforms,
remodeling of office buildings. Training buildings, office trailers. Etc.
·
·
Project
Engineer & design on various Concrete foundations, concrete paving and Asphalt paving projects
·
Project
Engineering on various Railroad instillations
·
Project
Manager for Asbestos Abatement-handling and disposing.
·
Managed
Digester repair (overlay), inspection, reporting and maintenance.
·
Project
Engineering Evaluations of monorails, tanks, and piping.
·
$1.0MM
Plant Air upgrade- Project Manager- 1MM of Cost reduction.
·
Tank Installations, 50k to 2MM gallons, CS,
SS, Exotic metals, FG -Green liquor tank, Nitrate tanks, Acid tanks, Black
Liquor tanks, Ammonium Nitrate tanks,
Water tanks, fuel tanks, & powder (solids)
tanks
·
Water
clarification, Clarifiers, Anion-Cation and RO
filters, debris screens, Oil skimmer design, Makeup water systems.
·
Tank
upgrades and record keeping – revamping and upgrading to API 653 standards.
·
Numerous
piping and tank insulations complete with electrical and steam heat tracing for
below 0 winter climates.
·
Safety
Projects- Ladder gates, Machine guarding, structural platforms for both
operators and maintenance access
·
$2.1
MM Project Engineer on installation of Hot Air Furnaces,
·
Maintenance
reliability projects- rotating equipment vibration reductions, pump base
restoration, mechanical drive revamping, PRV design and installation, relief
devices design and installs.
SPECIALIZED TRAINING
Proficient in AutoCAD,
Microsoft Office, Microsoft Project, Timeline, Sap Systems, Advantis,
Lotus Notes & JD Edwards, and high level of safety training in HAZ-op and
PSM areas